The original wall can be seen below the window. Painted with a black moisture stop paint.
Here the excavated space in which the new wall will be placed. 32 tires were extracted from the backfill.
The top of the trench from the entry of the driveway.
He block wall as it stands now. Each block is about 2000lbs.
This is the floor portion of the new entry way. The rock entry made by my dad can be seen at his feet.
Here is the almost completed entry way.